澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票

当前位置:首页-澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票 > 澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票废气烟囱(排气筒)规格要求

发布人:http://olivierbernier.com   发布时间:2021-10-31 12:10:36

1烟囱结构设计应符合《烟囱设计规范》(GB 50051――2002)和《钢结构设计规范》(GB 50017――2003)的要求。

1 chimney structure design shall comply with the requirements of code for design of chimneys (GB 50051-2002) and code for design of steel structures (GB 50017-2003).

2.设计烟囱时,应根据使用条件、功能要求、烟囱高度、材料供应及施工条件等因素,确定采用砖烟囱、钢筋混凝土烟囱或钢烟囱。

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票2. When designing chimney, brick chimney, reinforced concrete chimney or steel chimney shall be determined according to service conditions, functional requirements, chimney height, material supply, construction conditions and other factors.

3.下列情况不宜采用砖烟囱:①重要的或高度大于60 m的烟囱;②地震设防裂度为9度地区的烟囱;③地震设防裂度为8度时,Ill、IV类场地的烟囱。

3. Brick chimneys should not be used under the following circumstances: ① important chimneys or chimneys with a height greater than 60m; ② Chimneys in areas with seismic fortification crack degree of 9; ③ When the seismic fortification crack is 8 degrees, the chimneys of ill and IV sites.

4.烟囱基础一般宜采用板式基础。板式基础可以是环形或圆形的。在条件允许时,可采用壳式基础。

QQ截图20170428145514.png

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票4. Generally, slab foundation should be adopted for chimney foundation. The slab foundation can be annular or circular. Shell foundation can be adopted when conditions permit.

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票5.烟囱筒壁和基础的受热温度应符合下列规定:

5. The heating temperature of chimney wall and foundation shall meet the following requirements:

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票①烧结普通鄙土砖筒壁的受热温度不应超过400℃;

① The maximum heating temperature of sintered common clay brick cylinder wall shall not exceed 400 ℃;

②钢筋混凝土筒壁和基础以及素混凝土基础,受热温度不应超过150℃;

② The heating temperature of reinforced concrete cylinder wall and foundation and plain concrete foundation shall not exceed 150 ℃;

③钢烟囱筒壁的受热温度应符合相关规定。

③ The maximum heating temperature of steel chimney wall shall comply with relevant regulations.

6.烟囱的荷载与作用可分为下列三类:

6. The load and action of chimney can be divided into the following three categories:

①性荷载与作用:结构自重、土重。土压力、拉线的拉力;

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票① Permanent load and action: structure weight and soil weight. Earth pressure and pulling force of stay wire;

②可变荷载与作用

② Variable loads and actions

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票③偶然荷载:罕遇地震作用、拉线断线、撞击、爆炸等。

③ Accidental load: rare earthquake, pull wire breakage, impact, explosion, etc.

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票7.烟囱的高度应同时满足国家污染物排放标准及环境评价的要求。

澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票7. The height of chimney shall meet the requirements of national pollutant emission standard and environmental assessment at the same time.


上一篇:通风风管中风管与支吊架安装注意事项
下一篇:风管道在安装过程中应该怎么预防振动和噪音?

网站首页 关于我们 澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票 澳门金牛版1877-澳门彩1877cc-1877彩票购彩大厅-1877.cc彩票 工程案例 在线留言 联系我们

今日开马网站-105333香港赛马-hkjc香港赛马主页投注-香港神算子97567-香港神算子四肖